How To Achieve 1+1>2 with Multi-Generator Parallel Operation? – An In-Depth Look at Kawo's Parallel System
Home » News » Industry News » How To Achieve 1+1>2 with Multi-Generator Parallel Operation? – An In-Depth Look at Kawo's Parallel System

How To Achieve 1+1>2 with Multi-Generator Parallel Operation? – An In-Depth Look at Kawo's Parallel System

Views: 5941     Author: Site Editor     Publish Time: 2025-03-26      Origin: Site

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

How to Achieve 1+1>2 with Multi-Generator Parallel Operation? – An In-Depth Look at Kawo's Parallel System

1. Parallel System Components

Synchronization Control Module
▸ Frequency deviation control ≤0.25Hz
▸ Voltage deviation control ≤2%

Load Sharing Controller
▸ Active power imbalance <5%
▸ Reactive power imbalance <3%

2. Core Challenges & Solutions

Circulating Current Suppression
▸ CAN bus communication (latency <10ms)
▸ Dynamic excitation current adjustment

Sudden Load Response
▸ 20% preset redundant capacity
▸ Governor response time <0.5 seconds

3. Typical Configuration Case

Data Center Project: 4×2000kW Parallel Units
▸ Automatic switch to N+1 mode upon single-unit failure
▸ Total Harmonic Distortion (THD) <3%

(Note: Technical terms are kept precise for engineering accuracy while maintaining readability for international clients.)

Key Features:

  • Precision Control for seamless synchronization

  • Intelligent Load Management ensuring balanced distribution

  • Fail-Safe Redundancy for mission-critical operations